Home > Case Studies > Summit Centre – Solar Panel System

Summit Centre – Solar Panel System

Client

Taff Bargoed Development

The Background

The Taff Bargoed Climbing Centre has recently installed a new solar panel system to the front of their complex. Due to the nature of the solar panels, they needed to ensure that no one could gain access into the area without permission. Therefore Taff Bargoed development approached Procter Contracts for a solution.

The Solution

After a site survey, it was suggested by a Procter Contracts representative that they should have a 2.4m high pro-mesh fencing system. The system provided was installed with a 2m wide double leaf access gate to match. By carrying out the works it meant the solar farm was secured from the public to re-open the complex.

The Result or Feedback

“I wish to express that the Taff Bargoed Development Trust is very pleased with the work carried out by Procter Contracts at the Trusts centre. The work concerned the erection of 2.4-metre mesh fencing, gates and also the erection of timber posts which was a test although Procter was not found wanting and they were professional throughout and I will use the company again in the future.”

"I wish to express that the Taff Bargoed Development Trust is very pleased with the work carried out by Procter Contracts at the Trusts centre. "
Howard Jackson - Trust Manager - TBDT